ABOUT USSERVICESGALLERYBLOG
LATEST NEWS

The work is in full swing.

2026-09-15 19:15:52
The day really turned out to be productive today with well advanced concrete works. First of all, they laid the reinforced mesh, after which they made accurate markings for the future concrete pouring. Everything was prepared and checked before proceeding directly to concreting. As a result, about 3 cubes of concrete were poured with a layer of 10 centimeters. When performing the work, all the necessary technical requirements were observed: the base was properly prepared, the required layer thickness was maintained and special attention was paid to the slope. It is necessary for the normal drainage of water so that it does not stagnate on the surface in the future. At first glance, concrete pouring may seem like a simple job, but it is on proper preparation and compliance with the technology that depends on how long the finished coating will last. Therefore, we try not to rush and do everything qualitatively from the markup to the filling itself. Today we have done the main part of the work, then we let the concrete gain strength and move on to the next stage. Let's move on!
← From our blog